![]() Great Lakes and Carver will be developing the first U.S. The rock will be quarried locally, transported to the quayside on the Hudson River, and loaded onto Great Lakes Dredge’s rock installation vessel Acadia, which will install the rock starting in 2025. Through this subcontract, Houston-based Great Lakes Dredge will use rock produced in the state of New York to provide scour protection for offshore wind turbine foundations and substations at Equinor and bp’s Empire Wind I and Empire Wind II wind farms. offshore wind farm with Carver Sand & Gravel LLC, a quarry located in Schoharie, N.Y. announced today it has signed the first ever subcontract for procurement of rock for a U.S.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |